The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
Memorial Seats
Harry Symes seat situated by the door of St Mary's Church Micheldever
There are many seats scattered around the villages in memory of local residents.
They are listed here.
Please advise us if you have information on any we have missed by emailing micheldevervillages123@gmail.com
Click here to view the seats we have recorded