The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
Acerca de
Facilities in the Villages
Here you will find links to the local facilities available in the area
Thank you to all the facilities for giving us the information listed below.
​
The Local Pubs
The Churches
Micheldever Village & Station
​
East Stratton
​
Woodmancote
​
​